A time lapse video up to and including drilling and dimpling. I had an issue at the end with the microstop countersink slipping and I am waiting on some “oops rivets” to arrive to finish it. I’ll start on the right tab tonight.
[stream flv=x:/www.brunbergs.net/wp-content/uploads/2015/04/lefttrimtab1.240p.flv img=x:/www.brunbergs.net/wp-content/uploads/2015/04/TrimTabShot1-300×169.jpg mp4=x:/www.brunbergs.net/wp-content/uploads/2015/04/lefttrimtab1.mp4 embed=false share=false width=640 height=360 dock=true controlbar=over bandwidth=high autostart=false responsive=16:9 /]
wow – you are really ramping up the activity here – I’ll have to remember to check back more frequently now 🙂
also, nice haircut!
Gee, thanks!