Workshop 99%

Well, the workshop is now basically complete for the purposes of building an airplane. 

image

image

All the utilities, including compressed air and electricity are complete. 

image

image

image

Insulation and weather sealing are complete.  Machine tools with the exception of the lathe and mill are set.  Workbenches are placed and the sound system is functioning.

The only items left to do are:

Hang the ceiling
Build stands for and install the lathe and mill
Purchase metal brake/slip roll/ shear and install it
Finish wall sheeting around doors

Other than those items, which can be completed on the fly while building the airplane, it’s all set!  On to finishing the vertical stabilizer.

image

One thought on “Workshop 99%”

  1. It looks really fantastic. You put a lot of work into it and it’s really great to see it all coming together. Now we just need a two-way radio to the house so I don’t have to go out in the cold to get ahold of you in the winter!

Leave a Reply

Your email address will not be published. Required fields are marked *