Elevator Trim Servo Bracket Assembly

This evening I took the primed parts for the elevator trim servo system and assembled them. All rivets were squeezed using the longeron die to get around the tall flanges on the bracket itself. Time this evening: 2.5 hrs.

The initial rivets
20160223_205248.jpg

Push-Pull Rod brackets installed
20160223_230129.jpg

Servo and servo linkage installed
20160223_230113.jpg

Torque Sealed the servo mounting nuts
20160223_231537.jpg